Research on Project Initiation Coordination Based on Differentiation Analysis
- DOI
- 10.2991/978-2-38476-541-6_116How to use a DOI?
- Keywords
- Digital self-construction project; High quality; Streamline
- Abstract
At present, the digital self-built project of Liaoning Company has a large scale of requirements, multiple participating entities and a long management chain. There is a lack of efficient supporting means for requirement coordination and workload assessment, which makes it difficult to coordinate requirements and unify the measurement of workload, seriously affecting the quality of digital construction and the accuracy of investment. It is prone to lead to redundant construction. It is difficult to collect grassroots requirements, and the demand decision analysis lacks the support of professional demand information, which easily results in duplicate construction of functions and increased burden on the grassroots. This project improves the project’s accuracy, effectiveness and standardization through detailed project planning coordination, strengthening workload review, promoting the early control of the company’s digital projects, strengthening the quality of digital construction, and promoting precise control and efficient auditing of the digital construction process. It effectively helps with enterprise-level coordination and construction of rigid execution framework, continuously improving the project’s accuracy, effectiveness and standardization, and continuously enhancing the management and construction strength, promoting the company’s digital construction to develop towards high-quality and lean direction.
- Copyright
- © 2026 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Fengxi Gao AU - Zhuohang Wu AU - Jiayu Li AU - Dawei Ning AU - Mingze Sun PY - 2026 DA - 2026/02/26 TI - Research on Project Initiation Coordination Based on Differentiation Analysis BT - Proceedings of the 2025 5th International Conference on Culture, Design and Social Development (CDSD 2025) PB - Atlantis Press SP - 1039 EP - 1045 SN - 2352-5398 UR - https://doi.org/10.2991/978-2-38476-541-6_116 DO - 10.2991/978-2-38476-541-6_116 ID - Gao2026 ER -