Main Problems and Solutions for UHV Project Construction in Remote Areas
- DOI
- 10.2991/978-94-6239-719-4_14How to use a DOI?
- Keywords
- Remote Areas; UHV Projects; Construction Management; Problem Analysis
- Abstract
Under the extraordinary development stage, UHV construction in remote areas faces increasing difficulties and challenges. Systematically analyze typical problems in UHV project construction management in remote areas, and propose management model optimization plans with promotion value, which will help improve the quality and efficiency of UHV project management. This study analyzes the main problems faced by UHV project construction in remote areas in terms of technology, management, resources, and ecology, and puts forward strategic suggestions from four aspects: building a technological innovation system, a management framework, a resource guarantee system, and an ecological management and control system.
- Copyright
- © 2026 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Liyu Xia AU - Zhe Wei AU - Wan He AU - Jiaping Han PY - 2026 DA - 2026/07/09 TI - Main Problems and Solutions for UHV Project Construction in Remote Areas BT - Proceedings of the 2026 6th International Conference on Enterprise Management and Economic Development (ICEMED 2026) PB - Atlantis Press SP - 117 EP - 123 SN - 2352-5428 UR - https://doi.org/10.2991/978-94-6239-719-4_14 DO - 10.2991/978-94-6239-719-4_14 ID - Xia2026 ER -