Proceedings of the 2024 7th International Conference on Civil Architecture, Hydropower and Engineering Management (CAHEM 2024)

Research on the Benefit Calculation Method of Prefabricated Residential Building EPC Project from a Supply Chain Perspective

Authors
Mengkai Liu1, *, Ling Pan1
1School of Management, Wuhan University of Science and Technology, Wuhan, China
*Corresponding author. Email: mengkailiu@wust.edu.cn
Corresponding Author
Mengkai Liu
Available Online 31 January 2025.
DOI
10.2991/978-94-6463-650-5_24How to use a DOI?
Keywords
Prefabricated building; Project benefits; Subcontractor selection decisions; System dynamics
Abstract

In the subcontractor selection for prefabricated residential EPC project, it is still difficult for the general contractor to solve the problems of design-construction phase separation and realizing the maximum team potential, the research of project benefit calculation method has become the first problem to be solved. This study uses the literature induction method to extract the details of the benefit indicators, and a coupled model of the participant-benefit system has been constructed with the relative error of 2.66% based on the theory of system theory. The project benefits of the residential building A project has been calculated to be 132,500 yuan. The sensitivity results show that the design unit’s qualification level is most suitable when it is moderately above average.

Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2024 7th International Conference on Civil Architecture, Hydropower and Engineering Management (CAHEM 2024)
Series
Advances in Engineering Research
Publication Date
31 January 2025
ISBN
978-94-6463-650-5
ISSN
2352-5401
DOI
10.2991/978-94-6463-650-5_24How to use a DOI?
Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Mengkai Liu
AU  - Ling Pan
PY  - 2025
DA  - 2025/01/31
TI  - Research on the Benefit Calculation Method of Prefabricated Residential Building EPC Project from a Supply Chain Perspective
BT  - Proceedings of the 2024 7th International Conference on Civil Architecture, Hydropower and Engineering Management (CAHEM 2024)
PB  - Atlantis Press
SP  - 233
EP  - 244
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-650-5_24
DO  - 10.2991/978-94-6463-650-5_24
ID  - Liu2025
ER  -