Proceedings of the 2025 8th International Conference on Civil Architecture, Hydropower and Engineering Management (CAHEM 2025)

Research on the Optimization of Multi-Party Cooperation Model for Infrastructure PPP Projects Based on the Shapley Value Method

Authors
Jyh-Harng Shyng1, *, Jingqi Liang1
1Department of Landscape Architecture, School of Life Sciences, Zhaoqing University, Zhaoqing, 526061, Guangdong, China
*Corresponding author. Email: hidosing@outlook.com
Corresponding Author
Jyh-Harng Shyng
Available Online 26 February 2026.
DOI
10.2991/978-94-6239-600-5_25How to use a DOI?
Keywords
PPP; Shapley Value Method; Multi-Party Cooperation Optimization; Benefit Distribution; Risk Sharing
Abstract

To address unbalanced benefit distribution, ambiguous risk sharing, and insufficient cooperation stability among governments, social capital, and project companies in infrastructure Public-Private Partnership (PPP) projects, this study optimizes multi-party cooperation based on cooperative game theory and the Shapley value method. First, it systematically identifies risk factors throughout the project life cycle and constructs a “input-risk-contribution-satisfaction” four-dimensional correction framework. Then, an improved Shapley value model is established, using the Analytic Hierarchy Process (AHP) and fuzzy comprehensive evaluation to determine the weights and scores of correction factors for quantitative distribution of benefits and risks. Taking a provincial municipal road PPP project (total investment of 6 billion yuan, 20-year cooperation period) as an empirical case, the study compares the distribution results of traditional and improved models. Findings show the improved model increases social capital’s benefit share by 8.3%-12.5%, aligns governments’ and project companies’ risk ratios with their actual responsibilities, reduces cooperation default risk by 40%, and improves operational efficiency by 11.2%. This study provides a practical quantitative tool for infrastructure PPP cooperation mechanism design, contributing to the sustainable development of the PPP model.

Copyright
© 2026 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2025 8th International Conference on Civil Architecture, Hydropower and Engineering Management (CAHEM 2025)
Series
Advances in Engineering Research
Publication Date
26 February 2026
ISBN
978-94-6239-600-5
ISSN
2352-5401
DOI
10.2991/978-94-6239-600-5_25How to use a DOI?
Copyright
© 2026 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Jyh-Harng Shyng
AU  - Jingqi Liang
PY  - 2026
DA  - 2026/02/26
TI  - Research on the Optimization of Multi-Party Cooperation Model for Infrastructure PPP Projects Based on the Shapley Value Method
BT  - Proceedings of the 2025 8th International Conference on Civil Architecture, Hydropower and Engineering Management (CAHEM 2025)
PB  - Atlantis Press
SP  - 257
EP  - 265
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6239-600-5_25
DO  - 10.2991/978-94-6239-600-5_25
ID  - Shyng2026
ER  -