Application of BIM Technology in Whole Process Cost management of Hospital Construction Projects: An Analysis from the Hospital Engineering Investment Perspective
- DOI
- 10.2991/978-94-6463-736-6_22How to use a DOI?
- Keywords
- BIM Technology; Management; Hospital Construction Projects; Whole Process Investment Control
- Abstract
The construction of hospitals presents significant challenges in investment control and management due to their large-scale nature, extensive deployment of heavy equipment, and specialized medical systems. These complexities are further compounded by multiple participating entities, intricate construction processes, and coordination difficulties inherent in the building phase. This combination of factors creates substantial obstacles for effective capital allocation and cost containment in healthcare facility development. This paper takes a hospital construction project as an example. From the perspective of whole-process investment management, it analyzes the application of BIM technology across various stages including pre-construction, bidding and tendering, design, construction, and operation and maintenance phases. It can be observed that the application of BIM technology not only effectively addresses project coordination and communication challenges, but also enables accurate and detailed investment management throughout the entire project lifecycle. Furthermore, it enhances post-commissioning operation and maintenance management standards, significantly reduces hospital operational costs, and achieves effective control over capital utilization.
- Copyright
- © 2025 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Ning You AU - Qingkun Zhao AU - Bin Zhang AU - Huihui Yan PY - 2025 DA - 2025/05/22 TI - Application of BIM Technology in Whole Process Cost management of Hospital Construction Projects: An Analysis from the Hospital Engineering Investment Perspective BT - Proceedings of the 2025 4th International Conference on Engineering Management and Information Science (EMIS 2025) PB - Atlantis Press SP - 188 EP - 198 SN - 2352-538X UR - https://doi.org/10.2991/978-94-6463-736-6_22 DO - 10.2991/978-94-6463-736-6_22 ID - You2025 ER -