Risk Assessment Study of Underpassing Railway Turnout Area Using UBIT Method
- DOI
- 10.2991/978-94-6463-780-9_54How to use a DOI?
- Keywords
- Unified Bored Immersed Tube; Rail Transit; risk assessment
- Abstract
With the rapid development of urban rail transit, the issue of level crossings between train access lines and ground roads has become increasingly prominent, leading to frequent occurrences of “dead-end roads” that severely impact citizens’ travel experiences and urban traffic efficiency. To address this problem, this paper takes an underpass project in a railway switch area as an example, employing the Unified Bored Immersed Tube (UBIT) method for underpass construction and using the Fuzzy Comprehensive Evaluation (FCE) method to assess risks throughout the project. By establishing a hierarchical structure of risk factors and a quantitative index system, this paper identifies four major categories of risk factors: construction conditions, design plans, construction plans, and operational management. The Analytic Hierarchy Process (AHP) is used to determine the weights of each factor. The research results indicate that structural design and construction process control factors have the greatest impact on risk control, with a comprehensive risk assessment value of 4.26, classified as medium risk, necessitating corresponding control measures and emergency plans. This study provides a systematic risk assessment method and reference for similar projects.
- Copyright
- © 2025 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Naisheng Liu AU - Jiaye Wang PY - 2025 DA - 2025/07/03 TI - Risk Assessment Study of Underpassing Railway Turnout Area Using UBIT Method BT - Proceedings of the 2025 International Conference on Engineering Management and Safety Engineering (EMSE 2025) PB - Atlantis Press SP - 580 EP - 589 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-780-9_54 DO - 10.2991/978-94-6463-780-9_54 ID - Liu2025 ER -