Proceedings of the 2025 International Conference on Engineering Management and Safety Engineering (EMSE 2025)

Research on Key Technologies and Management Strategies in Assembly Building Construction for an EPC Project in Linqing City

Authors
Xianhui Xi1, *, Yongtao He2, Chaodui Shang3, Jianli Guo3
1Oxbridge College KMUST, Kunming, Yunnan, 650000, China
2YCIH NO. 4 CONSTRUCTION CO., LTD., Kunming, Yunnan, 650000, China
3Dehong Vocational College, Mangshi, Yunnan, 678400, China
*Corresponding author. Email: 745236619@qq.com
Corresponding Author
Xianhui Xi
Available Online 3 July 2025.
DOI
10.2991/978-94-6463-780-9_32How to use a DOI?
Keywords
Assembly building; Construction technology; Quality management; Progress control; Safety and security
Abstract

In the evolution of the construction sector towards enhanced sustainability and efficiency, prefabricated buildings have come to the fore. Nevertheless, issues such as component handling and construction procedures pose significant hurdles. This research investigates an Engineering, Procurement, and Construction (EPC) project located in Linqing City, focusing on the essential technologies and management strategies employed in the construction of assembly buildings. The project encompasses a variety of structural designs, with certain residential units achieving a notably high rate of prefabrication. To address construction-related challenges, including the delivery and storage of components, installation and connection processes, and joint waterproofing, innovative solutions were adopted. These included the integration of vehicle-crane operations, the utilization of high-precision equipment and testing technologies, and the implementation of advanced waterproofing techniques. Additionally, a comprehensive quality control system was established, encompassing all stages from component production to construction, alongside a scientifically informed schedule management framework. The results indicated significant improvements in both construction efficiency and quality, facilitating the seamless progression of the project and providing valuable insights for the advancement of the assembly building sector.

Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2025 International Conference on Engineering Management and Safety Engineering (EMSE 2025)
Series
Advances in Engineering Research
Publication Date
3 July 2025
ISBN
978-94-6463-780-9
ISSN
2352-5401
DOI
10.2991/978-94-6463-780-9_32How to use a DOI?
Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Xianhui Xi
AU  - Yongtao He
AU  - Chaodui Shang
AU  - Jianli Guo
PY  - 2025
DA  - 2025/07/03
TI  - Research on Key Technologies and Management Strategies in Assembly Building Construction for an EPC Project in Linqing City
BT  - Proceedings of the 2025 International Conference on Engineering Management and Safety Engineering (EMSE 2025)
PB  - Atlantis Press
SP  - 347
EP  - 357
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-780-9_32
DO  - 10.2991/978-94-6463-780-9_32
ID  - Xi2025
ER  -