Techniques for Cable Force Measurement During Construction of Cable-Stayed Bridge
Corresponding Author
Fentao Guo
Available Online 19 May 2025.
- DOI
- 10.2991/978-94-6463-728-1_38How to use a DOI?
- Keywords
- Cable-stayed bridge; measurement technique; frequency method
- Abstract
The schemes for cable force measurement during construction of the Longwan Bridge are described and the principle of the cable force measurement with frequency method is introduced. With the measurements of cable forces of the Longwan Bridge being taken as the research background, the relations between cable forces and frequencies are obtained by the combination of finite element method and spline fitting. In the end, part of the results of the measurement is presented.
- Copyright
- © 2025 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Fentao Guo AU - Yufeng Xu AU - Sixin Fu AU - Zhantao Zhang AU - Qilong Wang PY - 2025 DA - 2025/05/19 TI - Techniques for Cable Force Measurement During Construction of Cable-Stayed Bridge BT - Proceedings of the 3rd International Conference on Green Building, Civil Engineering and Smart City (GBCESC 2024) PB - Atlantis Press SP - 384 EP - 389 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-728-1_38 DO - 10.2991/978-94-6463-728-1_38 ID - Guo2025 ER -