Research on Field Inspection and Control Strategy of RCC Dam in Water Conservancy Project
- DOI
- 10.2991/978-94-6463-726-7_6How to use a DOI?
- Keywords
- water conservancy project dam; RCC; construction quality and inspection method
- Abstract
This paper discusses the on-site inspection and control strategy of dam RCC construction quality in water conservancy project, taking project A as an example. The dam of the project is a RCC gravity dam with a height of 103m and a total installed capacity of 920MW. Through the detailed analysis of raw materials, mix ratio, construction quality control, engineering quality detection and results, this paper summarizes the key points and strategies of RCC construction quality control, including unloading, liquidation, rolling operation control, mixing dry humidity and compaction control. The test results show that all the technical indexes of dam RCC meet the specification and design requirements, which provides a useful reference for similar projects.
- Copyright
- © 2025 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Pei Jian PY - 2025 DA - 2025/06/13 TI - Research on Field Inspection and Control Strategy of RCC Dam in Water Conservancy Project BT - Proceedings of the 2024 6th International Conference on Hydraulic, Civil and Construction Engineering (HCCE 2024) PB - Atlantis Press SP - 52 EP - 58 SN - 2589-4943 UR - https://doi.org/10.2991/978-94-6463-726-7_6 DO - 10.2991/978-94-6463-726-7_6 ID - Jian2025 ER -