Factor Analysis of Scheduling Challenges in Prefabricated Construction Projects
- DOI
- 10.2991/978-94-6463-726-7_45How to use a DOI?
- Keywords
- prefabricated construction; schedule management; factor analysis; project efficiency; sustainable construction
- Abstract
This study investigates the critical factors influencing the scheduling of prefabricated construction projects, a domain increasingly prioritized for its potential in addressing sustainability challenges in the construction industry. Drawing on factor analysis, the research identifies and quantifies key processes that impact project schedules, spanning design, production, transportation, and assembly stages. A comprehensive indicator system comprising 17 core processes was developed, and statistical analyses, including reliability and validity tests, confirmed the robustness of the data. The findings highlight that the design stage exerts the most significant influence on project schedules, emphasizing the importance of high-quality design outputs and effective coordination with downstream processes. Factor analysis revealed four primary influencing factors: technology and methods, project management competence, experience in similar projects, and design support. These factors collectively explain 83.54% of the variance in schedule performance. This study contributes to the literature by offering actionable insights for optimizing scheduling strategies in prefabricated construction projects. Practical recommendations include adopting advanced design technologies, enhancing project management training, leveraging lessons from similar projects, and prioritizing early-stage design quality. By addressing these factors, the prefabricated construction industry can achieve greater efficiency, reduce delays, and advance sustainability goals.
- Copyright
- © 2025 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Hongqin Zheng PY - 2025 DA - 2025/06/13 TI - Factor Analysis of Scheduling Challenges in Prefabricated Construction Projects BT - Proceedings of the 2024 6th International Conference on Hydraulic, Civil and Construction Engineering (HCCE 2024) PB - Atlantis Press SP - 465 EP - 472 SN - 2589-4943 UR - https://doi.org/10.2991/978-94-6463-726-7_45 DO - 10.2991/978-94-6463-726-7_45 ID - Zheng2025 ER -