Priorities for Rural Electricity Infrastructure Development in South Sulawesi Province Using Analytical Hierarchy Process Method

Authors
Bama Rusmali1, *
1Hasanuddin University, Makassar, Indonesia
*Corresponding author. Email: rusmalib24a@student.unhas.ac.id
Corresponding Author
Bama Rusmali
Available Online 20 June 2026.
DOI
10.2991/978-94-6239-709-5_135How to use a DOI?
Keywords
Rural Electrification; Electrical Infrastructure; AHP; Development Priorities; South Sulawesi
Abstract

The Electricity access in rural areas of South Sulawesi still faces inequality even though the national electrification ratio has exceeded 99%. Complex geo-graphical conditions and limited resources make determining priorities for electricity infrastructure development a major challenge. This study uses the Analytical Hierarchy Process (AHP) method to determine the priorities of villages that are not yet connected to the PLN electricity grid. Six main criteria were established, namely forest area, electrification method, infrastructure, electricity supply, distance from the grid, and population. Data was obtained through official documents and focus group discussions with PT PLN (Persero) South Sulawesi Electricity Project Implementation Unit. The analysis results show that the forest area factor has the most dominant weight (44.08%), followed by infrastructure conditions (21.99%) and distance (14.51%). Of the 61 villages analyzed, Lamasi Hulu Village was determined to be the highest priority with a score of 3.29, while Rampi Village was the lowest priority with a score of 1.51. The Consistency Ratio value of 0.0396 (< 0.1) indicates that the calculation results are consistent and acceptable. These findings provide a basis for more objective and data-driven decision-making in supporting the achievement of the 100% electrification target in South Sulawesi.

Copyright
© 2026 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 10th International Conference on Accounting, Management, and Economics (10th ICAME 2025)
Series
Advances in Economics, Business and Management Research
Publication Date
20 June 2026
ISBN
978-94-6239-709-5
ISSN
2352-5428
DOI
10.2991/978-94-6239-709-5_135How to use a DOI?
Copyright
© 2026 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Bama Rusmali
PY  - 2026
DA  - 2026/06/20
TI  - Priorities for Rural Electricity Infrastructure Development in South Sulawesi Province Using Analytical Hierarchy Process Method
BT  - Proceedings of the 10th International Conference on Accounting, Management, and Economics (10th ICAME 2025)
PB  - Atlantis Press
SP  - 1945
EP  - 1960
SN  - 2352-5428
UR  - https://doi.org/10.2991/978-94-6239-709-5_135
DO  - 10.2991/978-94-6239-709-5_135
ID  - Rusmali2026
ER  -