Proceedings of the 2025 4th International Conference on Bigdata Blockchain and Economy Management (ICBBEM 2025)

Research on the Analysis of Cost of Power Transmission and Transformation Project Based on DEMATEL Method

Authors
Biao Chen1, Huiying Wu1, *, Minquan Ye1, Hongyi Chen1
1State Grid Fujian Economic Research Institute, Fuzhou, Fujian, 350000, China
*Corresponding author. Email: wuhuiying2021@163.com
Corresponding Author
Huiying Wu
Available Online 31 May 2025.
DOI
10.2991/978-94-6463-742-7_4How to use a DOI?
Keywords
power transmission and transformation project; cost; DEMATEL method; analysis technology
Abstract

With the dynamic and stable development of the national economic form, the investment scale of power transmission and transformation projects is gradually increasing. In the process of power transmission and transformation project cost calculation and evaluation and settlement, there will be some controversial costs and large costs due to different time and space. The deviation of these costs is not conducive to the realization of the lean management goal of project cost and the efficient and accurate control of project investment. Therefore, this paper to better promote the project cost of the lean management goal realization, efficient accurate control of project investment, solve the controversial and time domain difference cost billing standard of business management practical problems, put forward the DEMATEL method based on power transmission and transformation project cost influence factor analysis technology, strengthen the power transmission and transformation project cost control, improve precision investment control ability to support.

Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2025 4th International Conference on Bigdata Blockchain and Economy Management (ICBBEM 2025)
Series
Advances in Intelligent Systems Research
Publication Date
31 May 2025
ISBN
978-94-6463-742-7
ISSN
1951-6851
DOI
10.2991/978-94-6463-742-7_4How to use a DOI?
Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Biao Chen
AU  - Huiying Wu
AU  - Minquan Ye
AU  - Hongyi Chen
PY  - 2025
DA  - 2025/05/31
TI  - Research on the Analysis of Cost of Power Transmission and Transformation Project Based on DEMATEL Method
BT  - Proceedings of the 2025 4th International Conference on Bigdata Blockchain and Economy Management (ICBBEM 2025)
PB  - Atlantis Press
SP  - 25
EP  - 33
SN  - 1951-6851
UR  - https://doi.org/10.2991/978-94-6463-742-7_4
DO  - 10.2991/978-94-6463-742-7_4
ID  - Chen2025