Proceedings of the International Conference on Sustainable Green Tourism Applied Science - Engineering Applied Science 2025 (ICOSTAS-EAS 2025)

Electrical Installation in Temple Area, Mranggen Village, Srumbung District, Magelang, Central Java

Authors
Anak Agung Ngurah Gde Sapteka1, *, Anak Agung Made Narottama1, Kadek Amerta Yasa1, I Wayan Sudiartha1, I Made Budiada1
1Electrical Engineering Department, Politeknik Negeri Bali, Bali, Indonesia
*Corresponding author. Email: sapteka@pnb.ac.id
Corresponding Author
Anak Agung Ngurah Gde Sapteka
Available Online 31 October 2025.
DOI
10.2991/978-94-6463-878-3_59How to use a DOI?
Keywords
Community Service; Electrical Installation; Mranggen Village
Abstract

This community service will be carried out at Ngejawa Ngebali Temple, Mranggen Village, Srumbung District, Magelang Regency, Central Java Province. The service is carried out by installing new lighting at the temple site. The installation of the lighting is assisted by partners, namely the temple caretakers, students from the Electrical Engineering Department of Politeknik Negeri Bali, and the local community around the temple. The primary purpose of installing lighting is to enhance the safety of electricity users and increase the intensity of lighting in the temple area, enabling all nighttime activities to be carried out properly and safely. The community service has prepared the electrical installation of the Ngejawa-Ngebali Temple in Mranggen Village, Srumbung District, Magelang, Central Java, with three lines: spare for the temple, SDP 01, and SDP 02. Each active line is loaded with 600 W using a 2.5mm2 single-core NYY cable.

Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the International Conference on Sustainable Green Tourism Applied Science - Engineering Applied Science 2025 (ICOSTAS-EAS 2025)
Series
Advances in Engineering Research
Publication Date
31 October 2025
ISBN
978-94-6463-878-3
ISSN
2352-5401
DOI
10.2991/978-94-6463-878-3_59How to use a DOI?
Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Anak Agung Ngurah Gde Sapteka
AU  - Anak Agung Made Narottama
AU  - Kadek Amerta Yasa
AU  - I Wayan Sudiartha
AU  - I Made Budiada
PY  - 2025
DA  - 2025/10/31
TI  - Electrical Installation in Temple Area, Mranggen Village, Srumbung District, Magelang, Central Java
BT  - Proceedings of the International Conference on Sustainable Green Tourism Applied Science - Engineering Applied Science 2025 (ICOSTAS-EAS 2025)
PB  - Atlantis Press
SP  - 533
EP  - 540
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-878-3_59
DO  - 10.2991/978-94-6463-878-3_59
ID  - Sapteka2025
ER  -