Time Cost Trade-Off Analysis for Time and Cost Optimization on The Water Treatment Plant (WTP) Construction Project
- DOI
- 10.2991/978-94-6463-732-8_21How to use a DOI?
- Keywords
- Construction; Crashing; TCTO; WTP
- Abstract
A project is a business or activity that is complex, non-routine, limited by time, budget, resources and performance specifications designed to meet consumer needs. The Water Treatment Plant (WTP) construction project in Pulau Pinang Village, which has a capacity of 50L/SPAM, affects access under public roads. Therefore, this research was carried out to speed up project time using the Time Cost Trade-Off Analysis (TCTO) method. TCTO is an analysis method used to speed up project completion time by compressing the schedule to get a more profitable project in terms of time (duration) and cost. TCTO analysis uses the Crashing method, assisted by Microsoft Project 2016 software. The research results show that the standard time to complete a project is 180 days, and after accelerating with a Crash time, the minimum project completion time becomes 147 days; while accelerating with a Crash time, the maximum project completion becomes 140 days. Alternative improvements based on critical hotspots in this research use maximum crashing. This result is evidenced by the efficiency of reducing the total project cost by 0.36%, namely IDR 26,709,375.38 and the efficiency of reducing the total project time by 22.2%, namely 40 days.
- Copyright
- © 2025 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Mardewi Jamal AU - Dharwati P. Sari AU - Dean Mangasi A. Hutajulu PY - 2025 DA - 2025/06/07 TI - Time Cost Trade-Off Analysis for Time and Cost Optimization on The Water Treatment Plant (WTP) Construction Project BT - Proceedings of the International Conference on Tropical Studies and Its Application (ICTROPS 2024) PB - Atlantis Press SP - 228 EP - 235 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-732-8_21 DO - 10.2991/978-94-6463-732-8_21 ID - Jamal2025 ER -