Analysis Of The Contracted Unit Price In The Samarinda Monitoring Center Building Project
- DOI
- 10.2991/978-94-6463-732-8_41How to use a DOI?
- Keywords
- AHSP 2021; BOW; Unit Price; SNI 2008
- Abstract
This research discusses the importance of cost estimates in project management, specifically in Indonesia. The ability to make accurate cost estimates is crucial for project estimators, as it affects their profitability and success in winning bids. If the bid price is too high, the estimator is likely to lose the auction, while a price that is too low can cause future difficulties. Various methods are available in Indonesia for planning project budget costs, including BOW, SNI 2008, AHSP 2021, and Field Prices. Contractors often base their bid prices on their own analysis, drawing on previous experience. However, this research aims to determine the most economical method by comparing these different methods. In the case of the Samarinda Monitoring Center Building project, the Contracted Price method is found to be the most economical, followed by SNI 2008, AHSP 2021, and the BOW method, which is the most expensive. In the calculation of the cost budget plan for the Samarinda Monitoring Center Building Construction using 4 methods, the Contracted Price method is more economical, namely Rp 2,461,096,000. SNI 2008 is the second most economical, which is IDR 3,421,554,000, then the 2021 AHSP method is IDR 3,512,540,000 and the most expensive BOW method is IDR 3,965,206,000.
- Copyright
- © 2025 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Tamrin Rahman AU - Dharwati P. Sari AU - Nindy Navidsha PY - 2025 DA - 2025/06/07 TI - Analysis Of The Contracted Unit Price In The Samarinda Monitoring Center Building Project BT - Proceedings of the International Conference on Tropical Studies and Its Application (ICTROPS 2024) PB - Atlantis Press SP - 453 EP - 462 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-732-8_41 DO - 10.2991/978-94-6463-732-8_41 ID - Rahman2025 ER -