Key Risk Factors Assessment for Metropolitan Underground Project
Corresponding Author
Shih-Tong Lu
Available Online December 2008.
- DOI
 - 10.2991/jcis.2008.6How to use a DOI?
 - Keywords
 - Underground construction project, Risk factors analysis, Fuzzy preference relations
 - Abstract
 Underground construction project in metropolis is more dynamic and risky. A key risk factors analysis will give project contractor a more rational basis on which to make decision. This study applies the fuzzy preference relations to deal with the degree of impact and rank for the main risk factors of a metropolitan underground project.
- Copyright
 - © 2008, the Authors. Published by Atlantis Press.
 - Open Access
 - This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
 
Cite this article
TY - CONF AU - Shih-Tong Lu AU - Cheng-Wei Lin AU - Hsin-Lung Liu PY - 2008/12 DA - 2008/12 TI - Key Risk Factors Assessment for Metropolitan Underground Project BT - Proceedings of the 11th Joint Conference on Information Sciences (JCIS 2008) PB - Atlantis Press SP - 35 EP - 41 SN - 1951-6851 UR - https://doi.org/10.2991/jcis.2008.6 DO - 10.2991/jcis.2008.6 ID - Lu2008/12 ER -