Optimization Technology of Construction Schedule and Cost Management in Whole-Process of Engineering Consulting

Authors
Hongji Fang1, *
1China International Postal and Telecommunications Exhibition and Advertisement Co., Ltd. Engineering Management Department, Beijing, 100031, China
*Corresponding author. Email: 1059088252@qq.com
Corresponding Author
Hongji Fang
Available Online 23 April 2025.
DOI
10.2991/978-94-6463-690-1_39How to use a DOI?
Keywords
construction; schedule; cost; engineering consulting; ICT
Abstract

The rapid development of information technology has become a key driver of transformation in the construction industry. The purpose of this paper is to explore the application of ICT in construction schedule and cost optimization. Through a systematic review and theoretical analysis of relevant literature, this paper comprehensively evaluates the potential of ICT in optimizing construction processes and controlling costs. Finally, some suggestions and prospects for the future development of ICT in the construction industry are proposed.

Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2024 6th International Conference on Economic Management and Model Engineering (ICEMME 2024)
Series
Advances in Economics, Business and Management Research
Publication Date
23 April 2025
ISBN
978-94-6463-690-1
ISSN
2352-5428
DOI
10.2991/978-94-6463-690-1_39How to use a DOI?
Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Hongji Fang
PY  - 2025
DA  - 2025/04/23
TI  - Optimization Technology of Construction Schedule and Cost Management in Whole-Process of Engineering Consulting
BT  - Proceedings of the 2024 6th International Conference on Economic Management and Model Engineering (ICEMME 2024)
PB  - Atlantis Press
SP  - 403
EP  - 410
SN  - 2352-5428
UR  - https://doi.org/10.2991/978-94-6463-690-1_39
DO  - 10.2991/978-94-6463-690-1_39
ID  - Fang2025
ER  -