Construction and Application of a BIM-based Progress Risk Management System for Quality Inspection and Evaluation in Hydropower Engineering Projects
- DOI
- 10.2991/978-94-6463-845-5_30How to use a DOI?
- Keywords
- BIM; quality inspection; hydropower engineering; risk analysis
- Abstract
Addressing the issue of project delay risks arising from the lagging quality inspection and assessment progress in hydropower projects, this study proposes a BIM-based quality inspection and assessment progress risk management system. By integrating three-dimensional models, quality inspection and assessment data, and construction progress information, the system enables dynamic risk analysis and early warning. Adopting a layered architecture design, the system encompasses the data layer, business layer, and presentation layer. It utilizes model lightweighting, unified coding, and multi-source data association technologies to conduct real-time comparisons between the completion rates of quality inspection and assessment and construction progress. Through the use of discrepancy coefficients and threshold values, the system determines the risk of delays. Combined with depth-first search algorithms and adjustment factors, the system can dynamically optimize the planning of remaining inspection and assessment tasks. A case study of a pumped storage project in Gansu Province has verified the effectiveness of this system in improving the efficiency of quality inspection and assessment and reducing the risk of delays, providing digital decision support for quality management in hydropower projects.
- Copyright
- © 2025 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Wanqin Ding AU - Shuo Ding AU - Zihao Shi AU - Motao Xu AU - Wendong Wang PY - 2025 DA - 2025/09/16 TI - Construction and Application of a BIM-based Progress Risk Management System for Quality Inspection and Evaluation in Hydropower Engineering Projects BT - Proceedings of the 2025 6th International Conference on Management Science and Engineering Management (ICMSEM 2025) PB - Atlantis Press SP - 285 EP - 293 SN - 2667-1271 UR - https://doi.org/10.2991/978-94-6463-845-5_30 DO - 10.2991/978-94-6463-845-5_30 ID - Ding2025 ER -