Proceedings of the 2025 8th International Conference on Traffic Transportation and Civil Architecture (ICTTCA 2025)

Economic Benefit Analysis of the Construction and Keeping Open Program Under the Condition of Unidirectional Closure of Highway Reconstruction and Expansion Project

Authors
Tao Li1, Juan Li2, *, Zhongguang Wu2, Zhanfu Li1, Junyin Wu1, Huang Peng1
1Anhui Transportation Holding Group Co., Ltd, Hefei, 230039, China
2Research Center for Standards and Metrology, China Academy of Transportation Sciences, Beijing, 100029, China
*Corresponding author. Email: 351390947@qq.com
Corresponding Author
Juan Li
Available Online 28 July 2025.
DOI
10.2991/978-94-6463-793-9_39How to use a DOI?
Keywords
Road traffic accidents; Economic losses; Evaluation index system; Analytical models
Abstract

Highway traffic accidents often cause traffic disruptions, leading to economic losses. The current methods of quantifying and reporting road traffic accident losses in China are unclear, lacking analyses of economic losses in reconstruction and expansion projects. Given the variety of traffic organization design schemes involved in reconstruction and expansion projects, a model was proposed to calculate the economic losses from traffic accidents under two modes: “construction while keeping traffic open” and “one-way closure.” The calculation key points of economic losses from accidents were clarified. The key points of traffic organization schemes under one-way closure conditions were established. The analysis covered economic losses from accidents, construction period savings, reduction of project costs, and operational toll revenue benefits. The economic benefits of different traffic organization modes were compared to provide references for selecting traffic organization schemes in other projects.

Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2025 8th International Conference on Traffic Transportation and Civil Architecture (ICTTCA 2025)
Series
Atlantis Highlights in Engineering
Publication Date
28 July 2025
ISBN
978-94-6463-793-9
ISSN
2589-4943
DOI
10.2991/978-94-6463-793-9_39How to use a DOI?
Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Tao Li
AU  - Juan Li
AU  - Zhongguang Wu
AU  - Zhanfu Li
AU  - Junyin Wu
AU  - Huang Peng
PY  - 2025
DA  - 2025/07/28
TI  - Economic Benefit Analysis of the Construction and Keeping Open Program Under the Condition of Unidirectional Closure of Highway Reconstruction and Expansion Project
BT  - Proceedings of the 2025 8th International Conference on Traffic Transportation and Civil Architecture (ICTTCA 2025)
PB  - Atlantis Press
SP  - 457
EP  - 466
SN  - 2589-4943
UR  - https://doi.org/10.2991/978-94-6463-793-9_39
DO  - 10.2991/978-94-6463-793-9_39
ID  - Li2025
ER  -