Based on the BIM and VR Integrated Simulation of the Construction Model of Cultural and Tourism Scenic Spot in Luhuang Town, Fengshun County, Meizhou City, China
- DOI
- 10.2991/978-94-6463-847-9_5How to use a DOI?
- Keywords
- BIM; Virtual Reality; Cultural Tourism; Construction Optimization; Simulation
- Abstract
The rapid development of cultural tourism and digital construction technologies has paved the way for innovative approaches to planning and managing scenic area projects. This study proposes an integrated model that combines Building Information Modeling (BIM) and Virtual Reality (VR) simulation to support the design, construction, and operational phases of cultural tourism projects. Using Liuhang Town in Fengshun County, Guangdong Province, China, as a case study, the model employs precise BIM-based geometric representations and VR-enhanced immersive simulations to optimize construction schedules, reduce material wastage, and enhance visitor experience. A mathematical framework is introduced to quantify construction complexity and simulate VR immersion parameters. The case study demonstrates significant improvements in construction time, cost efficiency, and visitor satisfaction. The proposed integrated BIM-VR model is a novel contribution to both digital construction and cultural tourism development, with implications for future research in urban development and smart management.
- Copyright
- © 2025 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Chen-Yuan Chiu AU - Ziwei Luo AU - Chang Liu AU - Yuyan Lin AU - Xilin Chen AU - Meiqi Chen AU - Yuxin Jiang PY - 2025 DA - 2025/09/23 TI - Based on the BIM and VR Integrated Simulation of the Construction Model of Cultural and Tourism Scenic Spot in Luhuang Town, Fengshun County, Meizhou City, China BT - Proceedings of the 2025 6th International Conference on Urban Construction and Management Engineering (ICUCME 2025) PB - Atlantis Press SP - 38 EP - 44 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-847-9_5 DO - 10.2991/978-94-6463-847-9_5 ID - Chiu2025 ER -