Discussion on Claims for Hydropower Projects Caused by Changes in Rock Grades
- DOI
- 10.2991/978-94-6463-847-9_21How to use a DOI?
- Keywords
- Rock grade; Hydropower engineering; Claim compensation
- Abstract
Under normal circumstances, the rock grades of hydropower projects do not change. However, in cases where the geological conditions are complex or the geological exploration in the early stage is insufficient, the actual rock mass conditions exposed after on-site excavation will change, which in turn will cause changes in the investment for hydropower engineering construction. Based on this, this paper discusses the investment changes caused by the variation of rock grades during the construction of hydropower projects. Through the detailed analysis of the assessment of rock grades and the cost changes caused by the variation of rock grades, it further proposes the conditions, supporting materials and claim procedures that should be met for claims due to the variation of rock grades, which can be referred to and drawn upon by both the contracting and subcontracting parties of water supply and power projects. This paper also deeply analyzes the process of rock grade determination, as well as the relevant regulations on rock grades in the model bidding documents for hydropower projects and the survey and design specifications, and puts forward suggestions for modification.
- Copyright
- © 2025 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Jianlong Zhang AU - Long Zhao AU - Jue Wang AU - Tianxia Qiao AU - Yuxie Zhang PY - 2025 DA - 2025/09/23 TI - Discussion on Claims for Hydropower Projects Caused by Changes in Rock Grades BT - Proceedings of the 2025 6th International Conference on Urban Construction and Management Engineering (ICUCME 2025) PB - Atlantis Press SP - 190 EP - 197 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-847-9_21 DO - 10.2991/978-94-6463-847-9_21 ID - Zhang2025 ER -