A Comprehensive Risk Management Evaluation of the Entire Process of Executing Investments in Power Grid Projects

Authors
Ruixin Qian1, Zhongjian Liu1, Xianing Jin1, Danlei Hu1, Bingliang Shan1, Junyao Liu1, *
1State Grid Economic and Technological Research Institute Co., Ltd., the State Grid Hubei Economic Research Institute, Hubei, Wuhan, 430000, China
*Corresponding author. Email: ljyhust11@163.com
Corresponding Author
Junyao Liu
Available Online 26 May 2025.
DOI
10.2991/978-94-6463-724-3_7How to use a DOI?
Keywords
risk management; system of indicators; weight combination; TOPSIS
Abstract

With the proposal of the national new energy development strategy and the reform of power system, accurate investment decision-making and investment efficiency improvement are quite important. For grid project investment needs to be considered from the whole process, constructing a risk management evaluation index system for the whole process of grid project investment implementation has become an important issue for grid enterprises. This paper proposes an evaluation model based on the combination of empowerment-TOPSIS, and the results of the case analysis show that the model can quantify the investment risk of grid projects from four dimensions: risk identification, risk early warning, risk response, and risk management mechanism improvement, so as to rank the investment risk evaluation level of the project.

Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2025 5th International Conference on Informatization Economic Development and Management (IEDM 2025)
Series
Advances in Economics, Business and Management Research
Publication Date
26 May 2025
ISBN
978-94-6463-724-3
ISSN
2352-5428
DOI
10.2991/978-94-6463-724-3_7How to use a DOI?
Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Ruixin Qian
AU  - Zhongjian Liu
AU  - Xianing Jin
AU  - Danlei Hu
AU  - Bingliang Shan
AU  - Junyao Liu
PY  - 2025
DA  - 2025/05/26
TI  - A Comprehensive Risk Management Evaluation of the Entire Process of Executing Investments in Power Grid Projects
BT  - Proceedings of the 2025 5th International Conference on Informatization Economic Development and Management (IEDM 2025)
PB  - Atlantis Press
SP  - 67
EP  - 76
SN  - 2352-5428
UR  - https://doi.org/10.2991/978-94-6463-724-3_7
DO  - 10.2991/978-94-6463-724-3_7
ID  - Qian2025
ER  -