Proceedings of the 2025 Seminar on Modern Property Management Talent Training Enabling New Productive Forces (MPMTT 2025)

Application and Research on the Installation Method of Bay Window in Prefabricated House

Authors
Minjiang Pu1, Xu An1, 2, *, Dingkun Chen1, Yangyang Wu1, Zilong Wang1
1China State Construction Seventh Engineering Bureau Co., Ltd., Zhengzhou, 450004, China
2Kunming University of Science and Technology, Kunming, 650031, China
*Corresponding author. Email: 1605689704@qq.com
Corresponding Author
Xu An
Available Online 3 July 2025.
DOI
10.2991/978-94-6463-778-6_30How to use a DOI?
Keywords
prefabricated residential bay window board; split prefabrication; stubble assembly
Abstract

Residential engineering bay window conventional design, bay window for cast-in-place bay window, bay window between masonry structure, for the disadvantages of the structure in construction, this paper puts forward the prefabricated residential bay window installation method, namely the bay window between masonry structure deepening for cast-in-place structure, the bay window top cast-in-place prefabricated, through cast-in-place structure at the top of the enterprise, after cast-in-place bay window structure template removed, through the reserved enterprises of prefabricated concrete plate of the bay window top, surface construction of fine stone concrete, sealing leveling the gap between the prefabricated slab.

Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2025 Seminar on Modern Property Management Talent Training Enabling New Productive Forces (MPMTT 2025)
Series
Advances in Economics, Business and Management Research
Publication Date
3 July 2025
ISBN
978-94-6463-778-6
ISSN
2352-5428
DOI
10.2991/978-94-6463-778-6_30How to use a DOI?
Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Minjiang Pu
AU  - Xu An
AU  - Dingkun Chen
AU  - Yangyang Wu
AU  - Zilong Wang
PY  - 2025
DA  - 2025/07/03
TI  - Application and Research on the Installation Method of Bay Window in Prefabricated House
BT  - Proceedings of the 2025 Seminar on Modern Property Management Talent Training Enabling New Productive Forces (MPMTT 2025)
PB  - Atlantis Press
SP  - 237
EP  - 245
SN  - 2352-5428
UR  - https://doi.org/10.2991/978-94-6463-778-6_30
DO  - 10.2991/978-94-6463-778-6_30
ID  - Pu2025
ER  -