Proceedings of the 2025 Seminar on Modern Property Management Talent Training Enabling New Productive Forces (MPMTT 2025)

On the Application of Fully Modular Prefabricated Steel Structure Stacking Box

Authors
Minjiang Pu1, Xu An1, 2, Mao Fu1, *, Hailong Ran1, Yongtai Lv1
1China State Construction Seventh Engineering Bureau Co., Ltd., Zhengzhou, 450004, China
2Kunming University of Science and Technology, Kunming, 650031, China
*Corresponding author. Email: 1944631164@qq.com
Corresponding Author
Mao Fu
Available Online 3 July 2025.
DOI
10.2991/978-94-6463-778-6_29How to use a DOI?
Keywords
Full modularization; assembly; steel structure; stacking
Abstract

The thor mountain, fire, mountain hospital rapid construction, bin structure solved the shortage of hospital beds, container structure system for the general engineering management personnel, but the construction industry personnel understanding of bin structure system, most of the stay in temporary prefabricated houses such as temporary building consciousness, because of its low structure performance, poor decoration perception, difficult to form the popular industry accepted and promotion, this article is based on the application of the actual project, the whole modular prefabricated steel structure bin to analysis, for similar projects [1].

Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2025 Seminar on Modern Property Management Talent Training Enabling New Productive Forces (MPMTT 2025)
Series
Advances in Economics, Business and Management Research
Publication Date
3 July 2025
ISBN
978-94-6463-778-6
ISSN
2352-5428
DOI
10.2991/978-94-6463-778-6_29How to use a DOI?
Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Minjiang Pu
AU  - Xu An
AU  - Mao Fu
AU  - Hailong Ran
AU  - Yongtai Lv
PY  - 2025
DA  - 2025/07/03
TI  - On the Application of Fully Modular Prefabricated Steel Structure Stacking Box
BT  - Proceedings of the 2025 Seminar on Modern Property Management Talent Training Enabling New Productive Forces (MPMTT 2025)
PB  - Atlantis Press
SP  - 230
EP  - 236
SN  - 2352-5428
UR  - https://doi.org/10.2991/978-94-6463-778-6_29
DO  - 10.2991/978-94-6463-778-6_29
ID  - Pu2025
ER  -