Proceedings of the 3rd International Conference on Science in Engineering and Technology (ICOSIET 2024)

Alternative for Managing ROB Floods at Sirenja Beach with Abrasion Protective Buildings

Authors
Amar Amar1, Andi Rusdin1, Setiyawan Setiyawan1, *, Syamsul Arifin1, Wirayuda Trisna2, Geby Chintiya2, Wahyu Setiaji2
1Lecture Civil Engineering Study Program, Faculty of Engineering, Tadulako University, Jl. Soekarno Hatta Kilometer 9 Tondo, Mantikulore, Palu, Central Sulawesi, Indonesia
2Student Civil Engineering Study Program, Faculty of Engineering, Tadulako University, Jl. Soekarno Hatta Kilometer 9 Tondo, Mantikulore, Palu, Central Sulawesi, Indonesia
*Corresponding author. Email: setiyawanvip@yahoo.co.id
Corresponding Author
Setiyawan Setiyawan
Available Online 7 July 2025.
DOI
10.2991/978-94-6463-768-7_41How to use a DOI?
Keywords
topography; bathymetry; land subsidence; rob flood
Abstract

As a result of the earthquake that occurred on September 28, 2018, in Donggala Regency, precisely in Sirenja District, Tompe Village, the phenomenon of land subsidence may be the occurrence of land subsidence to cause damage to existing coastal protection infrastructure and the entry of sea tides into land (rob floods), on the other hand, the possible causes of rob floods on Sirenja Beach are influenced by abrasion, namely erosion of coastal areas that caused by waves and currents to damage the existing infrastructure of coastal protection. This study aims to determine the causes of rob flooding and the handling of Sirenja Beach as a result of rob flooding that occurs. This research was conducted by analyzing topographic and bathymetric changes with the overlay cut and fill method before and after the disaster, then a SWOT analysis was carried out to select the right building to deal with rob floods that occurred. The results of topographic and bathymetric change analysis showed that before the earthquake and tsunami disaster, the sea depth value reached ± -97, 943 m, and the land height was at ± 13 m after the earthquake and tsunami sea depth conditions reached ± -59.0555 m with land height at ± + 8.48 masl then there were avalanches and piles with a total avalanche area of 0.100 km2 with a total volume of 931,531 m3 and a total stockpile area amounting to 0.308 km2 with a total volume of 3,017,743 m3. Then from the results of the SWOT analysis of the selection of the right building to deal with rob flooding on Sirenja Beach from each alternative building to overcome problems on Sirenja Beach in conditions with the treatment of Seawall buildings as polders getting a value of 47, treatment with Revetmen as polders getting a value of 31, with breakwater treatment obtained a value of -32 and a condition score value with treatment with Groin of -34. With the changes in topography and bathymetry between before and after the disaster, it showed significant results that on Sirenja Beach there was an average land subsidence of ± 5 m, and based on cut and fill analysis there was a change in the seabed where the volume of stockpiles was more dominant. So it can be concluded that the occurrence of rob flooding on Sirenja Beach is caused by land subsidence and the right building in protecting Sirenja Beach from rob flooding is sea wall with a polder system.

Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 3rd International Conference on Science in Engineering and Technology (ICOSIET 2024)
Series
Advances in Engineering Research
Publication Date
7 July 2025
ISBN
978-94-6463-768-7
ISSN
2352-5401
DOI
10.2991/978-94-6463-768-7_41How to use a DOI?
Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Amar Amar
AU  - Andi Rusdin
AU  - Setiyawan Setiyawan
AU  - Syamsul Arifin
AU  - Wirayuda Trisna
AU  - Geby Chintiya
AU  - Wahyu Setiaji
PY  - 2025
DA  - 2025/07/07
TI  - Alternative for Managing ROB Floods at Sirenja Beach with Abrasion Protective Buildings
BT  - Proceedings of the 3rd International Conference on Science in Engineering and Technology (ICOSIET 2024)
PB  - Atlantis Press
SP  - 369
EP  - 377
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-768-7_41
DO  - 10.2991/978-94-6463-768-7_41
ID  - Amar2025